[Free] 2018(May) EnsurePass Dumpsleader Microsoft 70-499 Dumps with VCE and PDF 131-140

Ensurepass.com : Ensure you pass the IT Exams
2018 May Microsoft Official New Released 70-499
100% Free Download! 100% Pass Guaranteed!

Recertification for MCSD: Application Lifecycle Management

Question No: 131 – (Topic 2)

You are using Microsoft Test Manager (MTM) to review the work items assigned to two of your team members.

You need to run a query from the Queries activity and compare the results to a second query without going to a second workstation.

What should you do?

  1. Click the New query option to open a second Queries activity.

  2. Click the Queries view to open a second Queries view, and compare the results of the two queries.

  3. Click New and create a new task from the drop-down menu.

  4. Launch another instance of MTM and execute a second query.

Answer: B

Question No: 132 – (Topic 2)

You are using Microsoft Test Manager (MTM) to perform exploratory testing. You need to insert an image into the comment area for the test run.

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

  1. Use the Add screenshot tool in the exploratory test runner and drag the selection box over the area of the screen you want to capture.

  2. Capture the image you want to insert by using your favorite screen capture utility and paste the image into the comment area of the exploratory testing window.

  3. Capture the image you want to insert by using your favorite screen capture utility and save the file to disk. Add the image as an attachment to the test run.

  4. Capture the image you want to insert by using your favorite screen capture utility. Drag and drop the file onto the comment area from the Windows Explorer.

Answer: A,C

Question No: 133 – (Topic 2)

You are a test developer using Microsoft Test Manager (MTM).

An application that you are testing has gone through a design change. The test case now has five test steps that contain obsolete parameters.

You need to completely remove these parameters, their data values, and their names, but keep the test steps intact.

What should you do?

  1. Delete all of the data value iterations for the obsolete parameters by clicking Delete iteration in the Parameter Values pane.

  2. Delete the obsolete parameters from the test case by clicking Rename parameter in the Parameter Values pane and replace the name with a blank replacement value.

  3. Delete the test steps with the old parameters and insert a new test step in their place.

  4. Delete the obsolete parameters from the test case by clicking Delete parameter in the Parameter Values pane and remove the parameter name from the test steps.

Answer: D

Question No: 134 DRAG DROP – (Topic 2)

You are the lead software tester for Contoso, Ltd. Your team uses Microsoft Visual Studio Premium 2012 to design and test all company software.

You are developing manual tests for a test plan for a new website. However, test steps that are used to log on to the application are being used by many test cases.

You need to create shared test steps.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Ensurepass 2018 PDF and VCE

Answer:

Ensurepass 2018 PDF and VCE

Ensurepass 2018 PDF and VCE

Explanation:

http://msdn.microsoft.com/en-us/library/vstudio/dd286655(v=vs.110).aspx

Question No: 135 – (Topic 2)

You are using Microsoft Test Manager (MTM).

You have a large list of existing test plans that are obsolete. These test plans should be kept for historical purposes. When testers click oi the Home button to select a test plan, the list is too long to easily navigate.

You need to show only the test plans that are currently being used. What should you do?

  1. In the Test Plan Manager view, right-click each obsolete test plan and select Hide.

  2. In the Test Plan Manager view, for each obsolete test plan select Delete test plan.

  3. In the test plan Properties, change the State to Inactive for each obsolete test plan.

  4. In the Test Plan Manager view, right-click each obsolete test plan and select Close.

  5. In the test plan Properties, change the State to Closed for each obsolete test plan.

Answer: C

Question No: 136 – (Topic 2)

You are using Microsoft Test Manager (MTM) to manually test for an ASP.NET website. You have previously created a test plan named QA Release 1.0 that contains 115 test cases, and you are now planning the testing for Release 2.0.

The QA Release 2.0 test plan must meet the following requirements:

->All the test cases in QA Release 1.0 should be available in QA Release 2.0.

->Testers should be able to change, add, or remove test cases from either the QA Release 1.0 test plan or the QA Release 2.0 test plan as required, without affecting the other test plan.

->Shared steps and test configuration from the QA Release 1.0 test plan need to be reflected in QA Release 2.0 test plan.

You need to facilitate simultaneous testing of the website by creating the QA Release 2.0

test plan according to the stated requirements. What should you do?

  1. Copy the root test suite from the QA Release 1.0 test plan into the QA Release 2.0 test plan.

  2. Clone the root test suite from the QA Release 1.0 test plan into the QA Release 2.0 test plan.

  3. Copy all the test cases from the QA Release 1.0 test plan into the QA Release 2.0 test plan by using the Create copy option in Test Case Manager.

  4. Export all the test cases from the QA Release 1.0 test plan into Excel, then import them into the QA Release 2.0 test plan.

Answer: B

Question No: 137 – (Topic 2)

You are a test developer using Microsoft Test Manager (MTM).

The test you are developing has a two validation steps that use a parameter named TotalPrice. The feature associated with TotalPrice has changed, making the parameter and the first validation step unnecessary. The second validation step requires a new parameter named Price.

You need to delete the TotalPrice parameter, along with its data values, and add the Price parameter to the second validation step.

What should you do?

  1. Delete the two validation steps and the TotalPrice parameter, and then delete the parameter values for TotalPrice.

  2. Delete the first validation step and insert the Price parameter into the second validation step.

  3. Delete the first validation step and rename TotalPrice to Price in the second validation step.

  4. Delete the first validation step and insert the Price parameter into the Action column of the second validation step.

Answer: C

Question No: 138 – (Topic 2)

You plan to conduct a test for a multi-tier ASP.NET website using Microsoft Test Manager (MTM). You have created a test plan named QA Release 1.0. You also have created a test setting for the QA Release 1.0 test plan with the Database, Web Client, and Web Server roles.

The QA Release 1.0 test plan must specify that test runs:

->Collect specific diagnostic trace information to help analyze bugs that are difficult to reproduce, and

->Collect information about which methods of your applications code were used

when a test case was run.

You need to configure the QA Release 1.0 test plan to meet these requirements. What should you do?

  1. Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact, and Test impact diagnostic data adapter settings.

  2. Enable and configure the IntelliTrace, ASP.NET profiler, and Event log diagnostic data adapter settings.

  3. Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact, and ASP.NET profiler diagnostic data adapter settings.

  4. Enable and configure the ASP.NET profiler, Code coverage, and IntelliTrace diagnostic data adapter settings.

Answer: A

Question No: 139 – (Topic 2)

You are using Microsoft Test Manager (MTM) to run manual tests.

Testers reported a bug during a test run on the V1.0 build. A build for V2.0 has been created. Testers are still running tests against the V1.0 build.

You need to verify that the bug has been fixed in build V2.0. What should you do?

  1. Change the default build for the test plan to V2.0 and run the test case.

  2. Run the test case with default settings; the latest build will be selected automatically.

  3. Change the build to V2.0 by using Run with options and run the test case.

  4. Change the build property for the test case to the V2.0 build and run the test case.

Answer: C

Question No: 140 – (Topic 2)

You are a test developer using Microsoft Test Manager (MTM).

You have a test case with a parameter variable that has several data values that are no longer needed because of a change to the specifications.

You need to remove these unneeded values. What should you do?

  1. Delete the unneeded iterations.

  2. Delete the unneeded test steps.

  3. Delete the unneeded parameter values.

  4. Delete the old parameters.

Answer: A

100% Ensurepass Free Download!
Download Free Demo:70-499 Demo PDF
100% Ensurepass Free Guaranteed!
Download 2018 EnsurePass 70-499 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

Your email address will not be published. Required fields are marked *